Checklist of APQP activities in NPD

APQP is advance product quality planning process (APQPP). APQP is a framework of procedures and techniques used to develop  products in industry, particularly in the automotive industry.

List of APQP activities 

APQP list comprises 5 phases. 

1. Product planning and program definition
2. Product design and development
3. Process design and development
4. Product and process validation
5. Feedback & Corrective action

Phase I : Product Planning and Program Definition

    1. Receipt of RFQ  (Receipt of drawing along with spec drawing/ref. sample)
    2. Formation of CFT
    3. Review of Drawing  / Feasibility Review and Risk Assessment
    4. Resource planning
    5. Past Problem History study
    6. Initial Kick Off meeting,
    7. Preparation of Part Information sheet (PIS)/ Initial Bill of material (BOM)
    8. Received LOI/Go ahead/Spec Meeting.
    9. Master List of Drawing/Std.
    10. Receiving CAD data from customer & other input for product design/development.
    11. Preparation of APQP Timing Plan.
    12. Prepare Preliminary Process Flow Chart
    13. Prepare Listing of special product and process characteristics
    14. Prepare Preliminary Listing of New equipment , tooling and facility requirements
    15. Taking supplier input on child part development feasibility
    16. Prepare Supplier PPAP requirement as per QA.
    17. Review & Management Support


Phase-2:-Product Design and Development

    1. Design/Drawing  & Data
    2. Engineering specification
    3. Material Specification
    4. BOM preparation
    5. ECN record & Requirement
    6. Decision on make & Buy
    7. Design of Tooling, Fixtures and other Requirements
    8. Preparation of inspection standard for brought out part
    9. Procurement of child part for proto type development
    10. Identification of new equipment requirement/ New tooling requirement/ New facilities/ Gauge/test equipments
    11. Acquiring all required new equipment/child part/gauges, etc
    12. Prepare proto type control plan
    13. Manufacturing of Tooling, Fixtures and other Requirements *
    14. Calibration of Tooling, Fixtures and other Requirements
    15. Make Trial /Event samples as per requirement (Customer/Internal)
    16. Part dispatch to customer
    17. Review product design and development plan
    18. Team feasibility commitment
    19. Operator & staff training
    20. Management presentation and support


Phase-3:-Process Design and Development

    1. Plant setup.
    2. Prepare new plant/Line layout
    3. Government clearance & approval for plant setup
    4. Land acquisition
    5. Plant construction/Line construction
    6. Plant audit & handover
    7. Preparation of Process flow chart
    8. Floor plan layout
    9.  Prepare Preliminary Process PFMEA
    10. Review Preliminary Process PFMEA.
    11. Prepare Prelaunch Control Plan  /PCS/PQCT
    12. Review  Prelaunch Control Plan  /PCS/PQCT
    13. Prepare WI/Inspection standards
    14. Make Trial /Event samples as per requirement (Customer/Internal)
    15. Make Trial /Event samples evaluation
    16. Prepare Operation Process Instruction./Supervisor  Training for change point
    17. Verify the outputs against Preliminary Control Plan (Initial Event Sample Trial)
    18. MSA/SPC
    19. Packaging Standard (Customer Defined)
    20. Review product & process quality system review


Phase-4:-Product & Process Validation

    1. Arranging material for trial run
    2. Arranging raw material & BOP
    3. Setup approval of tool
    4. Sample inspection as per drawing & control plan
    5. Sample submission & report submission to customer
    6. Feedback from customer
    7. Correction in tool (If required)
    8. Sample & ISIR report
    9. Production Trial run & corrective action (PPVT trial)
    10. PPAP preparation and submission to customer
    11. Packing evaluation
    12. MSA study
    13. SPC study for critical dimensions
    14. Review of  FMEA
    15. Prepare & Review Production Control Plan
    16. Review


Phase-5:-Production Launch, Assessment, and Improvement

    1. Conduct PSO (Part submission Order) as per PQCT/Control Plan
    2. PPAP approval from Customer
    3. Forward product to customer through Initial product control process.
    4. Feedback Analysis and corrective action
    5. Sign off Part Submission Warrant (PSW) with Customer
    6. Review of the  above activity until all points are not closed

APQP Timeline or APQP Matrix

For every project there will be project life. Start & end time will be fixed for any project.

Let’s say project life is 2 years. In these 2 years major events will be planned. These events are added into APQP timeline.

Each activity is measured on plan vs actual graph.


Draft photo of Complete APQP timeline,..


This is all about APQP short checklist of new product development. Hope you will found this informative and helpful.

Keep visiting for here for more informative articles.

You may also like following articles..

What are APQP activities in product development

What is 3M, 3K, 3G and 5S in Japanese industries

What are 7 steps in latest FMEA

Short Notes on MSA

QUALITY MANAGEMENT SYSTEM Problem solving by seven Quality tools

What is Vendor rating system of maruti suzuki company

Thank You for visiting here.

Post a Comment

1 Comments

  1. Thanks for giving us useful information ,if you see more check this site Upcoming New SUV cars in India Best deal under your budget.

    ReplyDelete

Thank You for comment, will reply you soon...